CIMC Modular Building System (CIMC-MBS), a business unit of CIMC Group, has grown into the largest provider of modular buildings and modular building systems in the world, by demonstrating that innovative design and patented building technology could truly alleviate traditional build constraints via shorter build time.
Since founding in 2004, CIMC-MBS has established and maintained several strategic co-operations with global chain hotels including Hilton, Marriot, Inter Continental, citizenM, senior high-end real estate development company Relevant Group, as well as three major international mining companies including Rio Tinto, BHP Billiton and FMG.
It has gradually grown from a modular building supplier to a company capable of providing Engineering, Procurement, Construction and Management (EPCM) services including development approval, conceptual design, detailed design, fabrication, logistics, onsitein stallation, project management and finance services.
CIMC-MBS Scope of Service
CIMC-MBS regards the BOPAS (Buildoffsite Property Assurance Scheme) accreditation as a serious and valuable asset to our business. As such, we have made a commitment to ensure that our product and processes comply fully with the BOPAS criteria. We have always adopted the holistic approach to all our projects, so it is with this philosophy that we look to be provide a full Design, Manufacture and Construction service aligned with the Build Offsite scheme.
Accreditation to industry-wide schemes is of paramount importance to the entire team at CIMC-MBS. There is a strong commitment and drive from the Senior Management team that filters through all members of CIMC-MBS and our sub-contractors and suppliers, consultants and operatives. Our existing portfolio of global accreditation to recognised schemes is further strengthened by the addition of BOPAS and it is a measure of assurance that we will continually strive to meet.
time : 2020
location :
Permanent Multi-storey Building
Construction Floor Area:3,200㎡
Modules:418
Rooms:418
Storeys:17
Stage:Completed
It covers an area of about 3,200㎡ and has 17 storeys, which provides 418 accomodation units for innovative people in the Science Park.
The ground and first floor are build by traditional scenario and additional 15 floors are applied with modular construction. More than 90% of the project was completed in the factory and then installed on the construction site.time : 2018
location : Birmingham, UK
Permanent multi-storey building
Construction area: 6022.38 m2
Number of modules: 104
Number of rooms: 178
Number of building layers: 9
Stage: Completed
time : 2017
location : Aberdeen, UK
Permanent multi-storey building
Construction area: 4993.47 m2
Number of modules: 99
Number of rooms: 173
Number of building layers: 4
Stage: Completed
time : 2007
location : London, UK
Permanent multi-storey building
Construction area: 7360.64 m2
Number of modules: 186
Number of rooms: 307
Number of building layers: 7
Stage: Completed
time : 2015
location : London, UK
Permanent multi-storey building
Constructionarea: 5586.9 m2
Numberof modules: 126
Numberof rooms: 204
Numberof building layers: 4
Stage: Completed
time : 2008
location : London, UK
Permanent multi-storey building
time : 2017
location : Hull, UK
Permanent multi-storey building
Construction area: m2
Number of modules: 94
Number of rooms: 143
Number of building layers: 6
Stage: Completed
time : 2016
location : Bristol, UK
Permanent multi-storey building
Construction area: 6674.5 m2
Number of modules: 113
Number of rooms: 201
Number of building layers: 4
Stage: Completed
time : 2017
location : London, UK
Permanent multi-storey building
Construction area:
Number of modules: 126
Number of rooms: 191
Number of building layers: 8
Stage: Completed
time : 2009
location : Crawley, UK
Permanent multi-storey building
Construction area: 5648.28 m2
Number of modules: 114
Number of rooms: 204
Number of building layers: 6
Stage: Completed
time : 2017
location : Aberdeen, UK
Permanent multi-storey building
Construction area: 4503.17 m2
Number of modules: 91
Number of rooms: 155
Number of building layers: 4
Stage: Completed
time : 2008
location : Hull, UK
Permanent multi-storey building
Construction area: 3712.33 m2
Number of modules: 175
Number of rooms: 125
Number of building layers: 5
Stage: Completed
time : 2017
location : Manchester, UK
Permanent multi-storey building
Construction area: 5822.09 m2
Number of modules: 125
Number of rooms: 220
Number of building layers: 6
Stage: Completed
time : 2018
location : Newcastle, UK
Permanent multi-storey building
Construction area: 29071.84 m2
Number of modules: 789
Number of rooms: 1261
Number of building layers: 11
Stage: Completed
time : 2016
location : Newcastle, UK
Permanent multi-storey building
Construction area: 5148.99 m2
Number of modules: 115
Number of rooms: 192
Number of building layers: 5
Stage: Completed
time : 2019
location : Perth, Australia
Permanent multi-storey building
Construction area: 7543.98 sqm
Number of modules: 252
Number of rooms: 160
Number of building layers: 17
Stage: Completed
time : 2013
location : Western Australia
Permanent multi-storey building
Construction area: 9061.43 m2
Numberof modules: 198
Numberof rooms: 285
Numberof building layers: 3
Stage: Completed
time : 2016
location : Kalgoorlie, Australia
Permanent multi-storey building
Construction area: 7421.08 m2
Number of modules: 89
Number of rooms: 180
Number of building layers: 4
Stage: Completed
time : 2014
location : Darwin, Australia
Permanent multi-storey building
Construction area: 8810.61 m2
Number of modules: 187
Number of rooms: 303
Number of building layers: 9
Stage: Completed
time : 2009
location : Port Haven, Australia
Temporary building
Construction area: 20805.12 m2
Number of modules: 344
Number of rooms: 1202
Number of building layers: 2
Stage: Completed
time : 2011
location : Western Australia
Temporary building
Construction area: 12096 m2
Number of modules: 800
Number of rooms: 1627
Number of building layers: 2
Stage: Completed
time : 2012
location : Western Australia
Temporary building
Construction area: 26611.2 m2
Number of modules: 640
Number of rooms: 2560
Number of building layers: 2
Stage: Completed
time : 2010
location : Western Australia
Temporary building
Construction area: 34171.2 m2
Number of modules:
Number of rooms:
Number of building layers: 2
Stage: Completed
time : 2012
location : Darwin, Australia
Temporary building
Construction area: 57307.98 m2
Number of modules: 3000
Number of rooms: 10000
Number of building layers: 2
Stage: Completed
time : 2018
location : California, United States
Permanent multi-storey building
Construction area: 1326.57 m2
Number of modules: 22
Number of rooms: 22
Number of building layers: 4
Stage: Completed
time : 2019
location : Dongguan, China
Functional building
Construction area: 6042 m2
Number of modules: 172
Number of building layers: 5
Stage: Completed
time : 2017
location : Shenzhen, China
Permanent multi-storey building
Construction area: 3716.05 m2
Number of modules: 46
Number of building layers: 3
Stage: Completed
time : 2018
location : Xiong'an, China
Temporary building
Construction area: 26198 m2
Number of modules: 593
Number of building layers: 3
Stage: Completed
time : 2015
location : Shenzhen, China
Permanent multi-storey building
Construction area: 32000 m2
Number of modules: 294
Number of building layers: 4
Stage: Completed
time : 2007
location : Amsterdam, Netherlands
Temporary accommodation
Construction area: 29.724 m2
Number of modules: 1000
Number of rooms: 1000
Number of building layers: 5
Stage: Completed
time : 2018
location : Ghana, Africa
Permanent multi-storey building
Construction area: 7156.16 m2
Number of modules: 108
Number of rooms: 141
Number of building layers: 5
Stage: Completed
time : 2020
location :
Permanent Multi-storey Building
Construction Floor Area:3,200㎡
Modules:418
Rooms:418
Storeys:17
Stage:Completed
It covers an area of about 3,200㎡ and has 17 storeys, which provides 418 accomodation units for innovative people in the Science Park.
The ground and first floor are build by traditional scenario and additional 15 floors are applied with modular construction. More than 90% of the project was completed in the factory and then installed on the construction site.time : 2019
location : Perth, Australia
Permanent multi-storey building
Construction area: 7543.98 sqm
Number of modules: 252
Number of rooms: 160
Number of building layers: 17
Stage: Completed
time : 2018
location : Birmingham, UK
Permanent multi-storey building
Construction area: 6022.38 m2
Number of modules: 104
Number of rooms: 178
Number of building layers: 9
Stage: Completed
time : 2017
location : Aberdeen, UK
Permanent multi-storey building
Construction area: 4993.47 m2
Number of modules: 99
Number of rooms: 173
Number of building layers: 4
Stage: Completed
time : 2007
location : London, UK
Permanent multi-storey building
Construction area: 7360.64 m2
Number of modules: 186
Number of rooms: 307
Number of building layers: 7
Stage: Completed
time : 2015
location : London, UK
Permanent multi-storey building
Constructionarea: 5586.9 m2
Numberof modules: 126
Numberof rooms: 204
Numberof building layers: 4
Stage: Completed
time : 2008
location : London, UK
Permanent multi-storey building
time : 2017
location : Hull, UK
Permanent multi-storey building
Construction area: m2
Number of modules: 94
Number of rooms: 143
Number of building layers: 6
Stage: Completed
time : 2007
location : Amsterdam, Netherlands
Temporary accommodation
Construction area: 29.724 m2
Number of modules: 1000
Number of rooms: 1000
Number of building layers: 5
Stage: Completed
time : 2018
location : Newcastle, UK
Permanent multi-storey building
Construction area: 29071.84 m2
Number of modules: 789
Number of rooms: 1261
Number of building layers: 11
Stage: Completed
time : 2016
location : Bristol, UK
Permanent multi-storey building
Construction area: 6674.5 m2
Number of modules: 113
Number of rooms: 201
Number of building layers: 4
Stage: Completed
time : 2017
location : London, UK
Permanent multi-storey building
Construction area:
Number of modules: 126
Number of rooms: 191
Number of building layers: 8
Stage: Completed
time : 2009
location : Crawley, UK
Permanent multi-storey building
Construction area: 5648.28 m2
Number of modules: 114
Number of rooms: 204
Number of building layers: 6
Stage: Completed
time : 2016
location : Kalgoorlie, Australia
Permanent multi-storey building
Construction area: 7421.08 m2
Number of modules: 89
Number of rooms: 180
Number of building layers: 4
Stage: Completed
time : 2018
location : California, United States
Permanent multi-storey building
Construction area: 1326.57 m2
Number of modules: 22
Number of rooms: 22
Number of building layers: 4
Stage: Completed
time : 2016
location : Newcastle, UK
Permanent multi-storey building
Construction area: 5148.99 m2
Number of modules: 115
Number of rooms: 192
Number of building layers: 5
Stage: Completed
time : 2017
location : Aberdeen, UK
Permanent multi-storey building
Construction area: 4503.17 m2
Number of modules: 91
Number of rooms: 155
Number of building layers: 4
Stage: Completed
time : 2019
location : Dongguan, China
Functional building
Construction area: 6042 m2
Number of modules: 172
Number of building layers: 5
Stage: Completed
time : 2009
location : Port Haven, Australia
Temporary building
Construction area: 20805.12 m2
Number of modules: 344
Number of rooms: 1202
Number of building layers: 2
Stage: Completed
time : 2011
location : Western Australia
Temporary building
Construction area: 12096 m2
Number of modules: 800
Number of rooms: 1627
Number of building layers: 2
Stage: Completed
time : 2012
location : Western Australia
Temporary building
Construction area: 26611.2 m2
Number of modules: 640
Number of rooms: 2560
Number of building layers: 2
Stage: Completed
time : 2010
location : Western Australia
Temporary building
Construction area: 34171.2 m2
Number of modules:
Number of rooms:
Number of building layers: 2
Stage: Completed
time : 2012
location : Darwin, Australia
Temporary building
Construction area: 57307.98 m2
Number of modules: 3000
Number of rooms: 10000
Number of building layers: 2
Stage: Completed
time : 2017
location : Shenzhen, China
Permanent multi-storey building
Construction area: 3716.05 m2
Number of modules: 46
Number of building layers: 3
Stage: Completed
time : 2018
location : Xiong'an, China
Temporary building
Construction area: 26198 m2
Number of modules: 593
Number of building layers: 3
Stage: Completed
time : 2014
location : Darwin, Australia
Permanent multi-storey building
Construction area: 8810.61 m2
Number of modules: 187
Number of rooms: 303
Number of building layers: 9
Stage: Completed
time : 2018
location : Ghana, Africa
Permanent multi-storey building
Construction area: 7156.16 m2
Number of modules: 108
Number of rooms: 141
Number of building layers: 5
Stage: Completed
time : 2013
location : Western Australia
Permanent multi-storey building
Construction area: 9061.43 m2
Numberof modules: 198
Numberof rooms: 285
Numberof building layers: 3
Stage: Completed
time : 2008
location : Hull, UK
Permanent multi-storey building
Construction area: 3712.33 m2
Number of modules: 175
Number of rooms: 125
Number of building layers: 5
Stage: Completed
time : 2015
location : Shenzhen, China
Permanent multi-storey building
Construction area: 32000 m2
Number of modules: 294
Number of building layers: 4
Stage: Completed
time : 2017
location : Manchester, UK
Permanent multi-storey building
Construction area: 5822.09 m2
Number of modules: 125
Number of rooms: 220
Number of building layers: 6
Stage: Completed
time : 2018
location : Ghana, Africa
Permanent multi-storey building
Construction area: 7156.16 m2
Number of modules: 108
Number of rooms: 141
Number of building layers: 5
Stage: Completed
time : 2019
location : Perth, Australia
Permanent multi-storey building
Construction area: 7543.98 sqm
Numberof modules: 252
Numberof rooms: 160
Numberof building layers: 17
Stage: Completed
time : 2013
location : Western Australia
Permanent multi-storey building
Construction area: 9061.43 m2
Numberof modules: 198
Numberof rooms: 285
Numberof building layers: 3
Stage: Completed
time : 2016
location : Kalgoorlie, Australia
Permanent multi-storey building
Construction area: 7421.08 m2
Number of modules: 89
Number of rooms: 180
Number of building layers: 4
Stage: Completed
time : 2014
location :
Permanent multi-storey building
Construction area: 8810.61 m2
Number of modules: 187
Number of rooms: 303
Number of building layers: 9
Stage: Completed
time : 2012
location : Darwin, Australia
Temporary building
Construction area: 57307.98 m2
Number of modules: 3000
Number of rooms: 10000
Number of building layers: 2
Stage: Completed
time : 2010
location : Western Australia
Temporary building
Construction area: 34171.2 m2
Number of modules:
Number of rooms:
Number of building layers: 2
Stage: Completed
time : 2012
location : Western Australia
Temporary building
Construction area: 26611.2 m2
Number of modules: 640
Number of rooms: 2560
Number of building layers: 2
Stage: Completed
time : 2011
location : Western Australia
Temporary building
Construction area: 12096 m2
Number of modules: 800
Number of rooms: 1627
Number of building layers: 2
Stage: Completed
time : 2009
location : Port Haven, Australia
Temporary building
Construction area: 20805.12 m2
Number of modules: 344
Number of rooms: 1202
Number of building layers: 2
Stage: Completed
time : 2018
location : Xiong'an, China
Temporary building
Construction area: 26198 m2
Number of modules: 593
Number of building layers: 3
Stage: Completed
time : 2017
location : Shenzhen, China
Permanent multi-storey building
Construction area: 3716.05 m2
Number of modules: 46
Number of building layers: 3
Stage: Completed
time : 2015
location : Shenzhen, China
Permanent multi-storey building
Construction area: 32000 m2
Numberof modules: 294
Numberof building layers: 4
Stage: Completed
time : 2019
location : Dongguan, China
Functional building
Construction area: 6042 m2
Number of modules: 172
Number of building layers: 5
Stage: Completed
time : 2014
location :
Permanent multi-storey building
Construction area: 8810.61 m2
Number of modules: 187
Number of rooms: 303
Number of building layers: 9
Stage: Completed
time : 2007
location : Amsterdam, Netherlands
Temporary accommodation
Construction area: 29.724 m2
Number of modules: 1000
Number of rooms: 1000
Number of building layers: 5
Stage: Completed
time : 2017
location : Aberdeen, UK
Permanent multi-storey building
Construction area: 4993.47 m2
Number of modules: 99
Number of rooms: 173
Number of building layers: 4
Stage: Completed
time : 2018
location : Birmingham, UK
Permanent multi-storey building
Construction area: 6022.38 m2
Number of modules: 104
Number of rooms: 178
Number of building layers: 9
Stage: Completed
time : 2017
location : Aberdeen, UK
Permanent multi-storey building
Construction area: 4503.17 m2
Number of modules: 91
Number of rooms: 155
Number of building layers: 4
Stage: Completed
time : 2017
location : Manchester, UK
Permanent multi-storey building
Construction area: 5822.09 m2
Numberof modules: 125
Numberof rooms: 220
Numberof building layers: 6
Stage: Completed
time : 2016
location : Bristol, UK
Permanent multi-storey building
Construction area: 6674.5 m2
Numberof modules: 113
Numberof rooms: 201
Numberof building layers: 4
Stage: Completed
time : 2017
location : London, UK
Permanent multi-storey building
Construction area:
Number of modules: 126
Number of rooms: 191
Number of building layers: 8
Stage: Completed
time : 2008
location : London, UK
Permanent multi-storey building
time : 2015
location : London, UK
Permanent multi-storey building
Constructionarea: 5586.9 m2
Numberof modules: 126
Numberof rooms: 204
Numberof building layers: 4
Stage: Completed
time : 2007
location : London, UK
Permanent multi-storey building
Construction area: 7360.64 m2
Number of modules: 186
Number of rooms: 307
Number of building layers: 7
Stage: Completed
time : 2017
location : Hull, UK
Permanent multi-storey building
Construction area: m2
Number of modules: 94
Number of rooms: 143
Number of building layers: 6
Stage: Completed
time : 2008
location : Hull, UK
Permanent multi-storey building
Construction area: 3712.33 m2
Number of modules: 175
Number of rooms: 125
Number of building layers: 5
Stage: Completed
time : 2009
location : Crawley, UK
Permanent multi-storey building
Construction area: 5648.28 m2
Number of modules: 114
Number of rooms: 204
Number of building layers: 6
Stage: Completed
time : 2018
location : Newcastle, UK
Permanent multi-storey building
Construction area: 29071.84 m2
Numberof modules: 789
Numberof rooms: 1261
Numberof building layers: 11
Stage: Completed
time : 2016
location : Newcastle, UK
Permanent multi-storey building
Construction area: 5148.99 m2
Number of modules: 115
Number of rooms: 192
Number of building layers: 5
Stage: Completed
time : 2018
location : California, United States
Permanent multi-storey building
Construction area: 1326.57 m2
Number of modules: 22
Number of rooms: 22
Number of building layers: 4
Stage: Completed
time : 2016
location : Kalgoorlie, Australia
Permanent multi-storey building
Construction area: 7421.08 m2
Number of modules: 89
Number of rooms: 180
Number of building layers: 4
Stage: Completed
time : 2014
location :
Permanent multi-storey building
Construction area: 8810.61 m2
Number of modules: 187
Number of rooms: 303
Number of building layers: 9
Stage: Completed
time : 2019
location : Perth, Australia
Permanent multi-storey building
Construction area: 7543.98 sqm
Numberof modules: 252
Numberof rooms: 160
Numberof building layers: 17
Stage: Completed
time : 2018
location : Newcastle, UK
Permanent multi-storey building
Construction area: 29071.84 m2
Numberof modules: 789
Numberof rooms: 1261
Numberof building layers: 11
Stage: Completed
time : 2018
location : California, United States
Permanent multi-storey building
Construction area: 1326.57 m2
Number of modules: 22
Number of rooms: 22
Number of building layers: 4
Stage: Completed
time : 2016
location : Newcastle, UK
Permanent multi-storey building
Construction area: 5148.99 m2
Number of modules: 115
Number of rooms: 192
Number of building layers: 5
Stage: Completed
time : 2019
location : Dongguan, China
Functional building
Construction area: 6042 m2
Number of modules: 172
Number of building layers: 5
Stage: Completed
time : 2016
location : Kalgoorlie, Australia
Permanent multi-storey building
Construction area: 7421.08 m2
Number of modules: 89
Number of rooms: 180
Number of building layers: 4
Stage: Completed
time : 2014
location :
Permanent multi-storey building
Construction area: 8810.61 m2
Number of modules: 187
Number of rooms: 303
Number of building layers: 9
Stage: Completed
time : 2017
location : Aberdeen, UK
Permanent multi-storey building
Construction area: 4993.47 m2
Number of modules: 99
Number of rooms: 173
Number of building layers: 4
Stage: Completed
time : 2018
location : Birmingham, UK
Permanent multi-storey building
Construction area: 6022.38 m2
Number of modules: 104
Number of rooms: 178
Number of building layers: 9
Stage: Completed
time : 2017
location : Aberdeen, UK
Permanent multi-storey building
Construction area: 4503.17 m2
Number of modules: 91
Number of rooms: 155
Number of building layers: 4
Stage: Completed
time : 2017
location : Manchester, UK
Permanent multi-storey building
Construction area: 5822.09 m2
Numberof modules: 125
Numberof rooms: 220
Numberof building layers: 6
Stage: Completed
time : 2016
location : Bristol, UK
Permanent multi-storey building
Construction area: 6674.5 m2
Numberof modules: 113
Numberof rooms: 201
Numberof building layers: 4
Stage: Completed
time : 2017
location : London, UK
Permanent multi-storey building
Construction area:
Number of modules: 126
Number of rooms: 191
Number of building layers: 8
Stage: Completed
time : 2008
location : London, UK
Permanent multi-storey building
time : 2015
location : London, UK
Permanent multi-storey building
Constructionarea: 5586.9 m2
Numberof modules: 126
Numberof rooms: 204
Numberof building layers: 4
Stage: Completed
time : 2007
location : London, UK
Permanent multi-storey building
Construction area: 7360.64 m2
Number of modules: 186
Number of rooms: 307
Number of building layers: 7
Stage: Completed
time : 2012
location : Darwin, Australia
Temporary building
Construction area: 57307.98 m2
Number of modules: 3000
Number of rooms: 10000
Number of building layers: 2
Stage: Completed
time : 2010
location : Western Australia
Temporary building
Construction area: 34171.2 m2
Number of modules:
Number of rooms:
Number of building layers: 2
Stage: Completed
time : 2012
location : Western Australia
Temporary building
Construction area: 26611.2 m2
Number of modules: 640
Number of rooms: 2560
Number of building layers: 2
Stage: Completed
time : 2011
location : Western Australia
Temporary building
Construction area: 12096 m2
Number of modules: 800
Number of rooms: 1627
Number of building layers: 2
Stage: Completed
time : 2009
location : Port Haven, Australia
Temporary building
Construction area: 20805.12 m2
Number of modules: 344
Number of rooms: 1202
Number of building layers: 2
Stage: Completed
time : 2018
location : Xiong'an, China
Temporary building
Construction area: 26198 m2
Number of modules: 593
Number of building layers: 3
Stage: Completed
time : 2017
location : Shenzhen, China
Permanent multi-storey building
Construction area: 3716.05 m2
Number of modules: 46
Number of building layers: 3
Stage: Completed
time : 2018
location : Ghana, Africa
Permanent multi-storey building
Construction area: 7156.16 m2
Number of modules: 108
Number of rooms: 141
Number of building layers: 5
Stage: Completed
time : 2013
location : Western Australia
Permanent multi-storey building
Construction area: 9061.43 m2
Numberof modules: 198
Numberof rooms: 285
Numberof building layers: 3
Stage: Completed
time : 2017
location : Hull, UK
Permanent multi-storey building
Construction area: m2
Number of modules: 94
Number of rooms: 143
Number of building layers: 6
Stage: Completed
time : 2008
location : Hull, UK
Permanent multi-storey building
Construction area: 3712.33 m2
Number of modules: 175
Number of rooms: 125
Number of building layers: 5
Stage: Completed
time : 2009
location : Crawley, UK
Permanent multi-storey building
Construction area: 5648.28 m2
Number of modules: 114
Number of rooms: 204
Number of building layers: 6
Stage: Completed
time : 2015
location : Shenzhen, China
Permanent multi-storey building
Construction area: 32000 m2
Numberof modules: 294
Numberof building layers: 4
Stage: Completed
time : 2007
location : Amsterdam, Netherlands
Temporary accommodation
Construction area: 29.724 m2
Number of modules: 1000
Number of rooms: 1000
Number of building layers: 5
Stage: Completed
1.According to the company's strategy, carry out the market development of HongKong's modular building or Modular Integrated Construction(MiC);
2.Pay attention to, collect and organize business opportunity information, marketinformation, industry information, competitor information, technology anddevelopment trends;
3.Maintain the cooperative relationship with different customers, groups, projectparticipants, etc. in the target market;
4.Participate in bidding work, identify customer requirements, engineeringtechnical issues, business issues, key deliverables, and provide customers withsolutions (technical/business solutions, related information, services,business knowledge);
5.Assist in drafting or reviewing agreements, contracts and other relateddocuments related to business cooperation, bidding, and strategic cooperation,and put forward basic requirements and suggestions;
6.Prepare and review the technical and commercial proposals of the bid, ensuringthat all required information has been included in the response;
7.Maintain communication with customers in a timely manner, dig out the potentialneeds and background information of the project, and formulate targeted biddingand market strategies.
1.Graduated with a bachelor's degree (undergraduate) or above in architecturalengineering, structural engineering, civil engineering, engineering managementand cost or related majors;
2.Knowledgebleand experienced in architectural engineering design/construction/projectmanagement/engineering cost;
3.Willing to work by strict deadlines and good at learning;
4.Can communicate with external personnel in Cantonese and English at work, and writeengineering and business documents in English;
5.Understand the housing construction industry in Hong Kong. Those who have workedin BD, ASD, CIC are preferred;
6.Knowledgeable and experienced in bidding and bidding management, those withbidding experience are preferred;
7.Working place is in Hong Kong.
1. Responsible for the marketing and sales of modular construction business in the international market;
2. Organize and coordinate the technical negotiation process with customers and complete all business negotiations before project implementation;
3. Organize market research to grasp the market dynamics of competitors and the status of competitors;
4. Develop new business models, attract strategic investment and find strategic partners;
1. Bachelor degree or above, related majors in architecture, mechanical design, management, or international business law, returnees with working experience are preferred.
2. More than 3-5 years of market expansion experience in a multinational company, or more than 2 years of resident overseas work experience (developed countries such as Europe and the United States or Australia are preferred), familiar with western culture etiquette and business environment;
3. Excellent international business communication, negotiation skills, excellent international market expansion and customer management capabilities;
4. Have strong ability to explore new markets, new fields and new customers, have the courage to open up and innovate, and have excellent team leadership and communication skills;
5. English can be used as a working language.