GALLERY
Holiday Inn Expres...
The main body of the project is an L-shaped six-storey building, the interior fit out MEP services installation and testing were mainly completed within the modules, with loose furniture and fittings also packed within the rooms.
The main body of the project is an L-shaped six-storey building, the interior fit out MEP services installation and testing were mainly completed within the modules, with loose furniture and fittings also packed within the rooms.
The main body of the project is an L-shaped six-storey building, the interior fit out MEP services installation and testing were mainly completed within the modules, with loose furniture and fittings also packed within the rooms.
The main body of the project is an L-shaped six-storey building, the interior fit out MEP services installation and testing were mainly completed within the modules, with loose furniture and fittings also packed within the rooms.
The main body of the project is an L-shaped six-storey building, the interior fit out MEP services installation and testing were mainly completed within the modules, with loose furniture and fittings also packed within the rooms.
Glassworks Student...
MBS tailored a modern student residence with innovative technology and flexible design. The site was once a glass-making factory, and architects used special bricks to make the building's exterior walls in harmony with the industrial history.
MBS tailored a modern student residence with innovative technology and flexible design. The site was once a glass-making factory, and architects used special bricks to make the building's exterior walls in harmony with the industrial history.
MBS tailored a modern student residence with innovative technology and flexible design. The site was once a glass-making factory, and architects used special bricks to make the building's exterior walls in harmony with the industrial history.
MBS tailored a modern student residence with innovative technology and flexible design. The site was once a glass-making factory, and architects used special bricks to make the building's exterior walls in harmony with the industrial history.
MBS tailored a modern student residence with innovative technology and flexible design. The site was once a glass-making factory, and architects used special bricks to make the building's exterior walls in harmony with the industrial history.
Qianhai Shenzhen-H...
The Qianhai Innovation Center project is mainly for office buildings and supporting buildings, which are constructed by modularization and steel structure. The project applied the EPC model and was successfully completed in only 6 months.
The Qianhai Innovation Center project is mainly for office buildings and supporting buildings, which are constructed by modularization and steel structure. The project applied the EPC model and was successfully completed in only 6 months.
The Qianhai Innovation Center project is mainly for office buildings and supporting buildings, which are constructed by modularization and steel structure. The project applied the EPC model and was successfully completed in only 6 months.
Travelodge Uxbridg...
The hotel is located in the centre of Uxbridge and there are no storage facilities and unloading areas for material transportation. However, CIMC Modular uses self-developed module connection system to stack at least 15 modules per day on average.
Premier Inn Hull
Five levels of bedroom accommodation above a multi-storey car park require a design capable to withstand high wind loadings. Our Verbus System provides a construction solution that is perfectly able to perform in regions with severe conditions.
Five levels of bedroom accommodation above a multi-storey car park require a design capable to withstand high wind loadings. Our Verbus System provides a construction solution that is perfectly able to perform in regions with severe conditions.
Five levels of bedroom accommodation above a multi-storey car park require a design capable to withstand high wind loadings. Our Verbus System provides a construction solution that is perfectly able to perform in regions with severe conditions.
Five levels of bedroom accommodation above a multi-storey car park require a design capable to withstand high wind loadings. Our Verbus System provides a construction solution that is perfectly able to perform in regions with severe conditions.
Five levels of bedroom accommodation above a multi-storey car park require a design capable to withstand high wind loadings. Our Verbus System provides a construction solution that is perfectly able to perform in regions with severe conditions.
/