CIMC Modular Building System (CIMC-MBS), a business unit of CIMC Group, has grown into the largest provider of modular buildings and modular building systems in the world, by demonstrating that innovative design and patented building technology could truly alleviate traditional build constraints via shorter build time.
Since founding in 2004, CIMC-MBS has established and maintained several strategic co-operations with global chain hotels including Hilton, Marriot, Inter Continental, citizenM, senior high-end real estate development company Relevant Group, as well as three major international mining companies including Rio Tinto, BHP Billiton and FMG.
It has gradually grown from a modular building supplier to a company capable of providing Engineering, Procurement, Construction and Management (EPCM) services including development approval, conceptual design, detailed design, fabrication, logistics, onsitein stallation, project management and finance services.
CIMC-MBS Scope of Service
CIMC-MBS regards the BOPAS (Buildoffsite Property Assurance Scheme) accreditation as a serious and valuable asset to our business. As such, we have made a commitment to ensure that our product and processes comply fully with the BOPAS criteria. We have always adopted the holistic approach to all our projects, so it is with this philosophy that we look to be provide a full Design, Manufacture and Construction service aligned with the Build Offsite scheme.
Accreditation to industry-wide schemes is of paramount importance to the entire team at CIMC-MBS. There is a strong commitment and drive from the Senior Management team that filters through all members of CIMC-MBS and our sub-contractors and suppliers, consultants and operatives. Our existing portfolio of global accreditation to recognised schemes is further strengthened by the addition of BOPAS and it is a measure of assurance that we will continually strive to meet.
time : 2020
location :
Permanent Multi-storey Building
Construction Floor Area:3,200㎡
Modules:418
Rooms:418
Storeys:17
Stage:Completed
It covers an area of about 3,200㎡ and has 17 storeys, which provides 418 accomodation units for innovative people in the Science Park.
The ground and first floor are build by traditional scenario and additional 15 floors are applied with modular construction. More than 90% of the project was completed in the factory and then installed on the construction site.time : 2018
location : Birmingham, UK
Permanent multi-storey building
Construction area: 6022.38 m2
Number of modules: 104
Number of rooms: 178
Number of building layers: 9
Stage: Completed
time : 2017
location : Aberdeen, UK
Permanent multi-storey building
Construction area: 4993.47 m2
Number of modules: 99
Number of rooms: 173
Number of building layers: 4
Stage: Completed
time : 2007
location : London, UK
Permanent multi-storey building
Construction area: 7360.64 m2
Number of modules: 186
Number of rooms: 307
Number of building layers: 7
Stage: Completed
time : 2015
location : London, UK
Permanent multi-storey building
Constructionarea: 5586.9 m2
Numberof modules: 126
Numberof rooms: 204
Numberof building layers: 4
Stage: Completed
time : 2008
location : London, UK
Permanent multi-storey building
time : 2017
location : Hull, UK
Permanent multi-storey building
Construction area: m2
Number of modules: 94
Number of rooms: 143
Number of building layers: 6
Stage: Completed
time : 2016
location : Bristol, UK
Permanent multi-storey building
Construction area: 6674.5 m2
Number of modules: 113
Number of rooms: 201
Number of building layers: 4
Stage: Completed
time : 2017
location : London, UK
Permanent multi-storey building
Construction area:
Number of modules: 126
Number of rooms: 191
Number of building layers: 8
Stage: Completed
time : 2009
location : Crawley, UK
Permanent multi-storey building
Construction area: 5648.28 m2
Number of modules: 114
Number of rooms: 204
Number of building layers: 6
Stage: Completed
time : 2017
location : Aberdeen, UK
Permanent multi-storey building
Construction area: 4503.17 m2
Number of modules: 91
Number of rooms: 155
Number of building layers: 4
Stage: Completed
time : 2008
location : Hull, UK
Permanent multi-storey building
Construction area: 3712.33 m2
Number of modules: 175
Number of rooms: 125
Number of building layers: 5
Stage: Completed
time : 2017
location : Manchester, UK
Permanent multi-storey building
Construction area: 5822.09 m2
Number of modules: 125
Number of rooms: 220
Number of building layers: 6
Stage: Completed
time : 2018
location : Newcastle, UK
Permanent multi-storey building
Construction area: 29071.84 m2
Number of modules: 789
Number of rooms: 1261
Number of building layers: 11
Stage: Completed
time : 2016
location : Newcastle, UK
Permanent multi-storey building
Construction area: 5148.99 m2
Number of modules: 115
Number of rooms: 192
Number of building layers: 5
Stage: Completed
time : 2019
location : Perth, Australia
Permanent multi-storey building
Construction area: 7543.98 sqm
Number of modules: 252
Number of rooms: 160
Number of building layers: 17
Stage: Completed
time : 2013
location : Western Australia
Permanent multi-storey building
Construction area: 9061.43 m2
Numberof modules: 198
Numberof rooms: 285
Numberof building layers: 3
Stage: Completed
time : 2016
location : Kalgoorlie, Australia
Permanent multi-storey building
Construction area: 7421.08 m2
Number of modules: 89
Number of rooms: 180
Number of building layers: 4
Stage: Completed
time : 2014
location : Darwin, Australia
Permanent multi-storey building
Construction area: 8810.61 m2
Number of modules: 187
Number of rooms: 303
Number of building layers: 9
Stage: Completed
time : 2009
location : Port Haven, Australia
Temporary building
Construction area: 20805.12 m2
Number of modules: 344
Number of rooms: 1202
Number of building layers: 2
Stage: Completed
time : 2011
location : Western Australia
Temporary building
Construction area: 12096 m2
Number of modules: 800
Number of rooms: 1627
Number of building layers: 2
Stage: Completed
time : 2012
location : Western Australia
Temporary building
Construction area: 26611.2 m2
Number of modules: 640
Number of rooms: 2560
Number of building layers: 2
Stage: Completed
time : 2010
location : Western Australia
Temporary building
Construction area: 34171.2 m2
Number of modules:
Number of rooms:
Number of building layers: 2
Stage: Completed
time : 2012
location : Darwin, Australia
Temporary building
Construction area: 57307.98 m2
Number of modules: 3000
Number of rooms: 10000
Number of building layers: 2
Stage: Completed
time : 2018
location : California, United States
Permanent multi-storey building
Construction area: 1326.57 m2
Number of modules: 22
Number of rooms: 22
Number of building layers: 4
Stage: Completed
time : 2019
location : Dongguan, China
Functional building
Construction area: 6042 m2
Number of modules: 172
Number of building layers: 5
Stage: Completed
time : 2017
location : Shenzhen, China
Permanent multi-storey building
Construction area: 3716.05 m2
Number of modules: 46
Number of building layers: 3
Stage: Completed
time : 2018
location : Xiong'an, China
Temporary building
Construction area: 26198 m2
Number of modules: 593
Number of building layers: 3
Stage: Completed
time : 2015
location : Shenzhen, China
Permanent multi-storey building
Construction area: 32000 m2
Number of modules: 294
Number of building layers: 4
Stage: Completed
time : 2007
location : Amsterdam, Netherlands
Temporary accommodation
Construction area: 29.724 m2
Number of modules: 1000
Number of rooms: 1000
Number of building layers: 5
Stage: Completed
time : 2018
location : Ghana, Africa
Permanent multi-storey building
Construction area: 7156.16 m2
Number of modules: 108
Number of rooms: 141
Number of building layers: 5
Stage: Completed
time : 2020
location :
Permanent Multi-storey Building
Construction Floor Area:3,200㎡
Modules:418
Rooms:418
Storeys:17
Stage:Completed
It covers an area of about 3,200㎡ and has 17 storeys, which provides 418 accomodation units for innovative people in the Science Park.
The ground and first floor are build by traditional scenario and additional 15 floors are applied with modular construction. More than 90% of the project was completed in the factory and then installed on the construction site.time : 2019
location : Perth, Australia
Permanent multi-storey building
Construction area: 7543.98 sqm
Number of modules: 252
Number of rooms: 160
Number of building layers: 17
Stage: Completed
time : 2018
location : Birmingham, UK
Permanent multi-storey building
Construction area: 6022.38 m2
Number of modules: 104
Number of rooms: 178
Number of building layers: 9
Stage: Completed
time : 2017
location : Aberdeen, UK
Permanent multi-storey building
Construction area: 4993.47 m2
Number of modules: 99
Number of rooms: 173
Number of building layers: 4
Stage: Completed
time : 2007
location : London, UK
Permanent multi-storey building
Construction area: 7360.64 m2
Number of modules: 186
Number of rooms: 307
Number of building layers: 7
Stage: Completed
time : 2015
location : London, UK
Permanent multi-storey building
Constructionarea: 5586.9 m2
Numberof modules: 126
Numberof rooms: 204
Numberof building layers: 4
Stage: Completed
time : 2008
location : London, UK
Permanent multi-storey building
time : 2017
location : Hull, UK
Permanent multi-storey building
Construction area: m2
Number of modules: 94
Number of rooms: 143
Number of building layers: 6
Stage: Completed
time : 2007
location : Amsterdam, Netherlands
Temporary accommodation
Construction area: 29.724 m2
Number of modules: 1000
Number of rooms: 1000
Number of building layers: 5
Stage: Completed
time : 2018
location : Newcastle, UK
Permanent multi-storey building
Construction area: 29071.84 m2
Number of modules: 789
Number of rooms: 1261
Number of building layers: 11
Stage: Completed
time : 2016
location : Bristol, UK
Permanent multi-storey building
Construction area: 6674.5 m2
Number of modules: 113
Number of rooms: 201
Number of building layers: 4
Stage: Completed
time : 2017
location : London, UK
Permanent multi-storey building
Construction area:
Number of modules: 126
Number of rooms: 191
Number of building layers: 8
Stage: Completed
time : 2009
location : Crawley, UK
Permanent multi-storey building
Construction area: 5648.28 m2
Number of modules: 114
Number of rooms: 204
Number of building layers: 6
Stage: Completed
time : 2016
location : Kalgoorlie, Australia
Permanent multi-storey building
Construction area: 7421.08 m2
Number of modules: 89
Number of rooms: 180
Number of building layers: 4
Stage: Completed
time : 2018
location : California, United States
Permanent multi-storey building
Construction area: 1326.57 m2
Number of modules: 22
Number of rooms: 22
Number of building layers: 4
Stage: Completed
time : 2016
location : Newcastle, UK
Permanent multi-storey building
Construction area: 5148.99 m2
Number of modules: 115
Number of rooms: 192
Number of building layers: 5
Stage: Completed
time : 2017
location : Aberdeen, UK
Permanent multi-storey building
Construction area: 4503.17 m2
Number of modules: 91
Number of rooms: 155
Number of building layers: 4
Stage: Completed
time : 2019
location : Dongguan, China
Functional building
Construction area: 6042 m2
Number of modules: 172
Number of building layers: 5
Stage: Completed
time : 2009
location : Port Haven, Australia
Temporary building
Construction area: 20805.12 m2
Number of modules: 344
Number of rooms: 1202
Number of building layers: 2
Stage: Completed
time : 2011
location : Western Australia
Temporary building
Construction area: 12096 m2
Number of modules: 800
Number of rooms: 1627
Number of building layers: 2
Stage: Completed
time : 2012
location : Western Australia
Temporary building
Construction area: 26611.2 m2
Number of modules: 640
Number of rooms: 2560
Number of building layers: 2
Stage: Completed
time : 2010
location : Western Australia
Temporary building
Construction area: 34171.2 m2
Number of modules:
Number of rooms:
Number of building layers: 2
Stage: Completed
time : 2012
location : Darwin, Australia
Temporary building
Construction area: 57307.98 m2
Number of modules: 3000
Number of rooms: 10000
Number of building layers: 2
Stage: Completed
time : 2017
location : Shenzhen, China
Permanent multi-storey building
Construction area: 3716.05 m2
Number of modules: 46
Number of building layers: 3
Stage: Completed
time : 2018
location : Xiong'an, China
Temporary building
Construction area: 26198 m2
Number of modules: 593
Number of building layers: 3
Stage: Completed
time : 2014
location : Darwin, Australia
Permanent multi-storey building
Construction area: 8810.61 m2
Number of modules: 187
Number of rooms: 303
Number of building layers: 9
Stage: Completed
time : 2018
location : Ghana, Africa
Permanent multi-storey building
Construction area: 7156.16 m2
Number of modules: 108
Number of rooms: 141
Number of building layers: 5
Stage: Completed
time : 2013
location : Western Australia
Permanent multi-storey building
Construction area: 9061.43 m2
Numberof modules: 198
Numberof rooms: 285
Numberof building layers: 3
Stage: Completed
time : 2008
location : Hull, UK
Permanent multi-storey building
Construction area: 3712.33 m2
Number of modules: 175
Number of rooms: 125
Number of building layers: 5
Stage: Completed
time : 2015
location : Shenzhen, China
Permanent multi-storey building
Construction area: 32000 m2
Number of modules: 294
Number of building layers: 4
Stage: Completed
time : 2017
location : Manchester, UK
Permanent multi-storey building
Construction area: 5822.09 m2
Number of modules: 125
Number of rooms: 220
Number of building layers: 6
Stage: Completed
time : 2018
location : Ghana, Africa
Permanent multi-storey building
Construction area: 7156.16 m2
Number of modules: 108
Number of rooms: 141
Number of building layers: 5
Stage: Completed
time : 2019
location : Perth, Australia
Permanent multi-storey building
Construction area: 7543.98 sqm
Numberof modules: 252
Numberof rooms: 160
Numberof building layers: 17
Stage: Completed
time : 2013
location : Western Australia
Permanent multi-storey building
Construction area: 9061.43 m2
Numberof modules: 198
Numberof rooms: 285
Numberof building layers: 3
Stage: Completed
time : 2016
location : Kalgoorlie, Australia
Permanent multi-storey building
Construction area: 7421.08 m2
Number of modules: 89
Number of rooms: 180
Number of building layers: 4
Stage: Completed
time : 2014
location :
Permanent multi-storey building
Construction area: 8810.61 m2
Number of modules: 187
Number of rooms: 303
Number of building layers: 9
Stage: Completed
time : 2012
location : Darwin, Australia
Temporary building
Construction area: 57307.98 m2
Number of modules: 3000
Number of rooms: 10000
Number of building layers: 2
Stage: Completed
time : 2010
location : Western Australia
Temporary building
Construction area: 34171.2 m2
Number of modules:
Number of rooms:
Number of building layers: 2
Stage: Completed
time : 2012
location : Western Australia
Temporary building
Construction area: 26611.2 m2
Number of modules: 640
Number of rooms: 2560
Number of building layers: 2
Stage: Completed
time : 2011
location : Western Australia
Temporary building
Construction area: 12096 m2
Number of modules: 800
Number of rooms: 1627
Number of building layers: 2
Stage: Completed
time : 2009
location : Port Haven, Australia
Temporary building
Construction area: 20805.12 m2
Number of modules: 344
Number of rooms: 1202
Number of building layers: 2
Stage: Completed
time : 2018
location : Xiong'an, China
Temporary building
Construction area: 26198 m2
Number of modules: 593
Number of building layers: 3
Stage: Completed
time : 2017
location : Shenzhen, China
Permanent multi-storey building
Construction area: 3716.05 m2
Number of modules: 46
Number of building layers: 3
Stage: Completed
time : 2015
location : Shenzhen, China
Permanent multi-storey building
Construction area: 32000 m2
Numberof modules: 294
Numberof building layers: 4
Stage: Completed
time : 2019
location : Dongguan, China
Functional building
Construction area: 6042 m2
Number of modules: 172
Number of building layers: 5
Stage: Completed
time : 2014
location :
Permanent multi-storey building
Construction area: 8810.61 m2
Number of modules: 187
Number of rooms: 303
Number of building layers: 9
Stage: Completed
time : 2007
location : Amsterdam, Netherlands
Temporary accommodation
Construction area: 29.724 m2
Number of modules: 1000
Number of rooms: 1000
Number of building layers: 5
Stage: Completed
time : 2017
location : Aberdeen, UK
Permanent multi-storey building
Construction area: 4993.47 m2
Number of modules: 99
Number of rooms: 173
Number of building layers: 4
Stage: Completed
time : 2018
location : Birmingham, UK
Permanent multi-storey building
Construction area: 6022.38 m2
Number of modules: 104
Number of rooms: 178
Number of building layers: 9
Stage: Completed
time : 2017
location : Aberdeen, UK
Permanent multi-storey building
Construction area: 4503.17 m2
Number of modules: 91
Number of rooms: 155
Number of building layers: 4
Stage: Completed
time : 2017
location : Manchester, UK
Permanent multi-storey building
Construction area: 5822.09 m2
Numberof modules: 125
Numberof rooms: 220
Numberof building layers: 6
Stage: Completed
time : 2016
location : Bristol, UK
Permanent multi-storey building
Construction area: 6674.5 m2
Numberof modules: 113
Numberof rooms: 201
Numberof building layers: 4
Stage: Completed
time : 2017
location : London, UK
Permanent multi-storey building
Construction area:
Number of modules: 126
Number of rooms: 191
Number of building layers: 8
Stage: Completed
time : 2008
location : London, UK
Permanent multi-storey building
time : 2015
location : London, UK
Permanent multi-storey building
Constructionarea: 5586.9 m2
Numberof modules: 126
Numberof rooms: 204
Numberof building layers: 4
Stage: Completed
time : 2007
location : London, UK
Permanent multi-storey building
Construction area: 7360.64 m2
Number of modules: 186
Number of rooms: 307
Number of building layers: 7
Stage: Completed
time : 2017
location : Hull, UK
Permanent multi-storey building
Construction area: m2
Number of modules: 94
Number of rooms: 143
Number of building layers: 6
Stage: Completed
time : 2008
location : Hull, UK
Permanent multi-storey building
Construction area: 3712.33 m2
Number of modules: 175
Number of rooms: 125
Number of building layers: 5
Stage: Completed
time : 2009
location : Crawley, UK
Permanent multi-storey building
Construction area: 5648.28 m2
Number of modules: 114
Number of rooms: 204
Number of building layers: 6
Stage: Completed
time : 2018
location : Newcastle, UK
Permanent multi-storey building
Construction area: 29071.84 m2
Numberof modules: 789
Numberof rooms: 1261
Numberof building layers: 11
Stage: Completed
time : 2016
location : Newcastle, UK
Permanent multi-storey building
Construction area: 5148.99 m2
Number of modules: 115
Number of rooms: 192
Number of building layers: 5
Stage: Completed
time : 2018
location : California, United States
Permanent multi-storey building
Construction area: 1326.57 m2
Number of modules: 22
Number of rooms: 22
Number of building layers: 4
Stage: Completed
time : 2016
location : Kalgoorlie, Australia
Permanent multi-storey building
Construction area: 7421.08 m2
Number of modules: 89
Number of rooms: 180
Number of building layers: 4
Stage: Completed
time : 2014
location :
Permanent multi-storey building
Construction area: 8810.61 m2
Number of modules: 187
Number of rooms: 303
Number of building layers: 9
Stage: Completed
time : 2019
location : Perth, Australia
Permanent multi-storey building
Construction area: 7543.98 sqm
Numberof modules: 252
Numberof rooms: 160
Numberof building layers: 17
Stage: Completed
time : 2018
location : Newcastle, UK
Permanent multi-storey building
Construction area: 29071.84 m2
Numberof modules: 789
Numberof rooms: 1261
Numberof building layers: 11
Stage: Completed
time : 2018
location : California, United States
Permanent multi-storey building
Construction area: 1326.57 m2
Number of modules: 22
Number of rooms: 22
Number of building layers: 4
Stage: Completed
time : 2016
location : Newcastle, UK
Permanent multi-storey building
Construction area: 5148.99 m2
Number of modules: 115
Number of rooms: 192
Number of building layers: 5
Stage: Completed
time : 2019
location : Dongguan, China
Functional building
Construction area: 6042 m2
Number of modules: 172
Number of building layers: 5
Stage: Completed
time : 2016
location : Kalgoorlie, Australia
Permanent multi-storey building
Construction area: 7421.08 m2
Number of modules: 89
Number of rooms: 180
Number of building layers: 4
Stage: Completed
time : 2014
location :
Permanent multi-storey building
Construction area: 8810.61 m2
Number of modules: 187
Number of rooms: 303
Number of building layers: 9
Stage: Completed
time : 2017
location : Aberdeen, UK
Permanent multi-storey building
Construction area: 4993.47 m2
Number of modules: 99
Number of rooms: 173
Number of building layers: 4
Stage: Completed
time : 2018
location : Birmingham, UK
Permanent multi-storey building
Construction area: 6022.38 m2
Number of modules: 104
Number of rooms: 178
Number of building layers: 9
Stage: Completed
time : 2017
location : Aberdeen, UK
Permanent multi-storey building
Construction area: 4503.17 m2
Number of modules: 91
Number of rooms: 155
Number of building layers: 4
Stage: Completed
time : 2017
location : Manchester, UK
Permanent multi-storey building
Construction area: 5822.09 m2
Numberof modules: 125
Numberof rooms: 220
Numberof building layers: 6
Stage: Completed
time : 2016
location : Bristol, UK
Permanent multi-storey building
Construction area: 6674.5 m2
Numberof modules: 113
Numberof rooms: 201
Numberof building layers: 4
Stage: Completed
time : 2017
location : London, UK
Permanent multi-storey building
Construction area:
Number of modules: 126
Number of rooms: 191
Number of building layers: 8
Stage: Completed
time : 2008
location : London, UK
Permanent multi-storey building
time : 2015
location : London, UK
Permanent multi-storey building
Constructionarea: 5586.9 m2
Numberof modules: 126
Numberof rooms: 204
Numberof building layers: 4
Stage: Completed
time : 2007
location : London, UK
Permanent multi-storey building
Construction area: 7360.64 m2
Number of modules: 186
Number of rooms: 307
Number of building layers: 7
Stage: Completed
time : 2012
location : Darwin, Australia
Temporary building
Construction area: 57307.98 m2
Number of modules: 3000
Number of rooms: 10000
Number of building layers: 2
Stage: Completed
time : 2010
location : Western Australia
Temporary building
Construction area: 34171.2 m2
Number of modules:
Number of rooms:
Number of building layers: 2
Stage: Completed
time : 2012
location : Western Australia
Temporary building
Construction area: 26611.2 m2
Number of modules: 640
Number of rooms: 2560
Number of building layers: 2
Stage: Completed
time : 2011
location : Western Australia
Temporary building
Construction area: 12096 m2
Number of modules: 800
Number of rooms: 1627
Number of building layers: 2
Stage: Completed
time : 2009
location : Port Haven, Australia
Temporary building
Construction area: 20805.12 m2
Number of modules: 344
Number of rooms: 1202
Number of building layers: 2
Stage: Completed
time : 2018
location : Xiong'an, China
Temporary building
Construction area: 26198 m2
Number of modules: 593
Number of building layers: 3
Stage: Completed
time : 2017
location : Shenzhen, China
Permanent multi-storey building
Construction area: 3716.05 m2
Number of modules: 46
Number of building layers: 3
Stage: Completed
time : 2018
location : Ghana, Africa
Permanent multi-storey building
Construction area: 7156.16 m2
Number of modules: 108
Number of rooms: 141
Number of building layers: 5
Stage: Completed
time : 2013
location : Western Australia
Permanent multi-storey building
Construction area: 9061.43 m2
Numberof modules: 198
Numberof rooms: 285
Numberof building layers: 3
Stage: Completed
time : 2017
location : Hull, UK
Permanent multi-storey building
Construction area: m2
Number of modules: 94
Number of rooms: 143
Number of building layers: 6
Stage: Completed
time : 2008
location : Hull, UK
Permanent multi-storey building
Construction area: 3712.33 m2
Number of modules: 175
Number of rooms: 125
Number of building layers: 5
Stage: Completed
time : 2009
location : Crawley, UK
Permanent multi-storey building
Construction area: 5648.28 m2
Number of modules: 114
Number of rooms: 204
Number of building layers: 6
Stage: Completed
time : 2015
location : Shenzhen, China
Permanent multi-storey building
Construction area: 32000 m2
Numberof modules: 294
Numberof building layers: 4
Stage: Completed
time : 2007
location : Amsterdam, Netherlands
Temporary accommodation
Construction area: 29.724 m2
Number of modules: 1000
Number of rooms: 1000
Number of building layers: 5
Stage: Completed
1. Responsible for the design of the main building, apartment design, exterior wall design, etc .;
2. Responsible for technical problem solving and technical guidance during the construction process;
3. Responsible for assisting in the selection of construction materials;
1. University degree or above, major in architecture or civil engineering.
2. Have more than two years working experience in architectural design. Design experience in Grade A architectural design institute is preferred.
3. Can independently complete the plan to the construction drawing design, and communicate, report and coordinate with the owner.
4. Good English literacy.
5. Familiar with commonly used drawing software and office software such as AUTOCAD, Photoshop and Office. Familiar with BIM software application is preferred.
1. Fully responsible for project management of specific projects, responsible for project safety, cost, quality, schedule control, and completion of project KPI indicators formulated by the company;
2. Determine the organization and responsibilities of the project team, decompose and implement the company's KPI indicators, and formulate project assessment, evaluation and incentive plans;
3. Responsible for implementing the company's quality / environment / occupational health and safety policy and overall goals within this project;
4. Strictly fulfill the contract signed with the construction unit and the project incentive plan signed with the company, and carry out phased target control to ensure the realization of the project goals;
5. Responsible for organizing the preparation of project quality plan, project management implementation plan or construction organization design, organizing related basic work such as engineering design changes, approximate budget adjustments, claims, etc., and cooperate with the company to do work inspection and valuation work;
6. Responsible for the optimal allocation and dynamic management of production factors such as manpower, materials, mechanical equipment, technology, and information for construction projects, and actively promote and apply new technologies, new processes, and new materials;
7. Responsible for coordinating internal and external issues of the project.
1. Bachelor degree or above, graduated from civil engineering, municipal administration, hydropower, industrial and civil construction, civil engineering and other related majors;
2. More than seven years of engineering management work experience in the construction industry, working experience as a project manager of a regular construction company for at least 3 years; able to communicate effectively with customers, designers, monitoring units, third-party testing agencies, etc .;
3. Familiar with the construction related laws, regulations, policies and industry codes of Australia, the United Kingdom, the United States and other project locations; be aware of the local construction organization and worker arrangement, and understand the local construction situation;
4. Familiar with the preliminary planning, design work content, process and key links of the project;
5. Familiar with project cost budget and settlement, including basement, foundation and standard floor construction / renovation;